Shortening construction period and heat countermeasures | Metal roofing and exterior wall painting "Shanetsu Top One"
No primer needed, shortening the construction period. Metal roof and exterior wall painting for factories and warehouses that serves six functions including rust prevention, heat insulation, and weather resistance.
To facility managers struggling with "heat insulation," "rust prevention," and "shortening construction periods" for metal roofs and exterior walls of factories and warehouses. Typical painting work requires three processes: one primer coat and two top coats. The more processes involved, the longer the construction period, which can easily impact factory operations. Shanetsu Top One Si-JY is a topcoat material that also serves as rust prevention, allowing the project to be completed with just two top coats, contributing to a shorter construction period. It is an all-in-one paint that fulfills six roles: heat insulation, weather resistance, rust prevention, adhesion, opacity, and shortening construction time. ■ No primer required (except in cases of severe rust): Reduces processes, making it easier to control construction time and costs. ■ Heat insulation: Effectively reflects near-infrared rays, demonstrating a temperature difference of 17.2°C between coated and uncoated areas (Fukuoka Prefecture, Kasuga City, Real Estate Office). ■ Weather resistance: Expected lifespan equivalent to 13-16 years (confirmed gloss retention rate of over 80% in accelerated weather resistance tests). ■ Rust prevention: No rust or blistering observed even after 60 cycles of cyclic corrosion testing (passed JIS K 5674). Astek Paint collaborates with 120 certified contractors specializing in factories and warehouses nationwide. We also support competitive estimates with other companies and assist in creating approval documents and estimates. *For more details, please download the materials or contact us.
- Company:アステックペイント 福岡本社/福岡事業本部/東京営業所/大阪営業所/沖縄営業所/バンコクオフィス
- Price:Other